Appendix A – Summary of changes to performance measures

The table below provides a description of the changes made in 2026-27 to performance measures and targets, in comparison to the 2025-26 Corporate Plan.

2026-27 performance measures

Description of changes

KPI 1.1 

Revised as a composite measure that considers both the delivery of market information products and stakeholder assessment of their relevance and timeliness.

KPI 1.2 

To address the potential risk of perceived bias, a process was undertaken to preselect the case study that will evaluate our achievement of this measure.

KPI 1.3 

New measure for 2026-27.

KPI 2.1 

Revised from a single numerical target measuring estimated total carbon abatement to separate sub-measures for individual schemes. This change supports greater transparency and robustness in abatement estimation as schemes and data evolve.

KPI 2.2 

Applications for the Nature Repair Market and Guarantee of Origin Scheme have been incorporated into this performance measure. In 2025-26, they were covered by a separate KPI with a baseline target.

KPI 2.4 

This KPI was part of another measure in 2025-26. It has been separated to assess stakeholder satisfaction with agency processes under Key Activity 2.

KPI 3.1 

Revised as a composite measure combining guidance and outreach activities with stakeholder assessment of engagement and guidance. This reduces duplication between closely related measures and provides a more balanced assessment of performance by integrating evidence of engagement activities with participant perceptions of their effectiveness.

KPI 3.3 

The 2026-27 target is for the Safeguard Mechanism reporting year 2025-26.

KPI 4.1 

Revised as a composite measure that assesses both system availability and the absence of significant cyber security incidents.

KPI 4.2 

To address the potential risk of perceived bias, a process was undertaken to preselect the case study that will evaluate our achievement of this measure.

KPI 4.3 

This KPI was part of another measure in 2025-26. It has been separated to assess stakeholder satisfaction with agency systems under Key Activity 4.

KPI 4.4 

To address the potential risk of perceived bias, a process was undertaken to preselect the case study that will evaluate our achievement of this measure.

 

Appendix B – Corporate Plan requirements

The table below summarises the PGPA Act requirements for corporate plans, including page references for each requirement.

 

Requirement

Page(s)

Statement of preparation

5

  • the reporting period for which the plan is prepared

5

  • the reporting periods covered by the plan

5

Introduction

6

Purpose

6

Operating context

9

  • environment

9

  • risk oversight and management 

12

  • capability

15

  • cooperation

15

  • subsidiaries

N/A

Key activities

17

Performance

18