Project and contract register
We publish information about:
- all projects registered under the Australian Carbon Credit Unit (ACCU) Scheme
- carbon abatement contracts awarded by us
- Australian carbon credit units (ACCUs) sold to us.
The ACCU Scheme project map is an interactive map of Australia which provides an overview of the volume, location and type of projects happening across the country.
The project register can be used by buyers who want to find possible sources of ACCUs. It can also be used by people who want to buy land that has an ACCU Scheme project on it. This will help them factor into the sale price the potential costs and benefits of the project.
The contract register may be used by market participants to determine the demand for ACCUs through the previous CER auction process. For more information see carbon abatement contracts.
| Project Name Sort descending | Project ID | Project Proponent | Method | Method type | Project location | Contract ID |
|---|---|---|---|---|---|---|
| Argyle Beef Herd Management Project | ERF169322 | ARGYLE FOODS PASTORAL PTY LTD | Carbon Credits (Carbon Farming Initiative-Beef Cattle Herd Management) Methodology Determination 2015 (Compilation No. 1) | Agriculture | New South Wales | n/a |
| Argyle Native Forest Protection Project | EOP101086 | Terra Carbon Pty Limited | Carbon Credits (Carbon Farming Initiative-Avoided Deforestation 1.1) Methodology Determination 2015 | Vegetation | New South Wales | CAC113876 |
| Arlington Regeneration Project | ERF169613 | MULGA AG CO PTY LTD | Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest-1.1) Methodology Determination 2013 (Compilation No. 3) | Vegetation | Queensland | CAC206856 |
| Armoobilla Regeneration Project | ERF101794 | LANIN HOLDINGS PTY LTD; NINAL VENTURES PTY LTD | Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest-1.1) Methodology Determination 2013 (Compilation No. 1) | Vegetation | Queensland | CAC102214 |
| Armstrong Carbon Project | ERF167440 | AGRIPROVE SOLUTIONS CO NO.1 PTY LTD | Carbon Credits (Carbon Farming Initiative-Measurement of Soil Carbon Sequestration in Agricultural Systems) Methodology Determination 2018 | Agriculture | Queensland | n/a |
| Arndilly Soil Carbon Project | ERF179130 | WPT LAND DEVELOPMENTS 2 PTY LTD | Carbon Credits (Carbon Farming Initiative-Estimation of Soil Organic Carbon Sequestration using Measurement and Models) Methodology Determination 2021 | Agriculture | New South Wales | n/a |
| ARROWSMITH AGGREGATION SOIL CARBON PROJECT | ERF191275 | PENAGRI CARBON PTY LTD | Carbon Credits (Carbon Farming Initiative-Estimation of Soil Organic Carbon Sequestration using Measurement and Models) Methodology Determination 2021 | Agriculture | Western Australia | n/a |
| Artemis Station | EOP100719 | Susan Shephard | Carbon Credits (Carbon Farming Initiative-Emissions Abatement through Savanna Fire Management) Methodology Determination 2015 | Savanna Fire Management | Queensland | CAC102334 |
| Artesian Range-Charnley Carbon Abatement | ERF101503 | Australian Wildlife Conservancy | Carbon Credits (Carbon Farming Initiative) (Reduction of Greenhouse Gas Emissions through Early Dry Season Savanna Burning-1.1) Methodology Determination 2013 | Savanna Fire Management | Western Australia | n/a |
| Ashley Carbon Project | ERF166972 | AGRIPROVE SOLUTIONS PTY LTD | Carbon Credits (Carbon Farming Initiative-Estimation of Soil Organic Carbon Sequestration using Measurement and Models) Methodology Determination 2021 | Agriculture | New South Wales | n/a |
| Ashwood Native Forest Protection Project | EOP100580 | Ashwood Carbon Project Pty Ltd | Carbon Credits (Carbon Farming Initiative-Avoided Deforestation 1.1) Methodology Determination 2015 | Vegetation | New South Wales | CAC116146 |
| ASM-Toongi Soil Carbon Project | ERF181880 | AUSTRALIAN STRATEGIC MATERIALS (HOLDINGS) LTD | Carbon Credits (Carbon Farming Initiative-Estimation of Soil Organic Carbon Sequestration using Measurement and Models) Methodology Determination 2021 | Agriculture | New South Wales | n/a |
| Astra Street Landfill Gas Project | ERF201672 | Newcastle City Council | Carbon Credits (Carbon Farming Initiative-Landfill Gas) Methodology Determination 2015 (Compilation No. 1) | Waste | New South Wales | n/a |
| Astrea Station | EOP100703 | S.C. BROWNING PTY. LTD. | Carbon Credits (Carbon Farming Initiative-Emissions Abatement through Savanna Fire Management) Methodology Determination 2015 | Savanna Fire Management | Queensland | CAC604533 |
| Atley Station Regeneration Project | ERF121592 | Trevor Hodshon and Caroleann Hodshon as the trustees for the Hodshon Family Trust | Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest-1.1) Methodology Determination 2013 (Compilation No. 3) | Vegetation | Western Australia | CAC973269 |
| ATP - 690 Geelong Road Plant Upgrade (Revoked) | ERF103456 | Australian Tallow Producers Pty. Ltd. as the Trustee for the ATP Trust | Carbon Credits (Carbon Farming Initiative-Industrial Electricity and Fuel Efficiency) Methodology Determination 2015 (Compilation No. 1) | Energy Efficiency | Victoria | n/a |
| Austin Downs Station Regeneration Project | ERF121665 | Tom Staley Jackson | Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest-1.1) Methodology Determination 2013 (Compilation No. 3) | Vegetation | Western Australia | CAC784319 |
| Australian Bluegum Plantations (ABP) Plantation Forestry Carbon Project #1 | ERF193774 | Australian Bluegum Plantations Pty Limited | Carbon Credits (Carbon Farming Initiative-Plantation Forestry) Methodology Determination 2022 | Vegetation | Victoria | n/a |
| Australian Forests For A Cleaner Climate #1 | ERF158240 | Corporate Carbon Advisory Pty Ltd | Carbon Credits (Carbon Farming Initiative-Plantation Forestry) Methodology Determination 2017 (Compilation No. 1) | Vegetation | Tasmania | n/a |
| Australian Forests for a Cleaner Climate #2 | ERF173373 | Corporate Carbon Advisory Pty Ltd | Carbon Credits (Carbon Farming Initiative-Plantation Forestry) Methodology Determination 2022 | Vegetation | Tasmania | n/a |
| Avoided plantation conversion project on permanent timber production zone land in Tasmania | ERF203358 | FORESTRY TASMANIA | Carbon Credits (Carbon Farming Initiative-Plantation Forestry) Methodology Determination 2022 | Vegetation | Tasmania | n/a |
| Avondale Human Induced Regeneration Project | ERF165905 | Terra Carbon Pty Limited | Carbon Credits (Carbon Farming Initiative) (Human-Induced Regeneration of a Permanent Even-Aged Native Forest-1.1) Methodology Determination 2013 (Compilation No. 3) | Vegetation | New South Wales | n/a |
| Awaba Landfill Gas Project | EOP100160 | LMS Energy Pty Ltd | Carbon Credits (Carbon Farming Initiative-Electricity Generation from Landfill Gas) Methodology Determination 2021 (Compilation No. 1) | Waste | New South Wales | n/a |
| Babinda Swamp Forest Restoration | ERF194937 | LANDSCAPE ECOLOGICAL SERVICES PTY LTD | Carbon Credits (Carbon Farming Initiative) (Reforestation by Environmental or Mallee Plantings-FullCAM) Methodology Determination 2014 (Compilation No. 2) | Vegetation | Queensland | n/a |
| Badgebup (Revoked) | ERF101367 | Carbon Positive Australia Ltd | Carbon Credits (Carbon Farming Initiative) (Reforestation by Environmental or Mallee Plantings-FullCAM) Methodology Determination 2014 | Vegetation | Western Australia | n/a |
| Carbon Abatement Contract ID | Contractor Name | Project(s) | Project ID | Auction date | Status |
|---|---|---|---|---|---|
| CAC767566 | George Timothy Arthur Gubbins and Isabella Priscilla Landale the Trustees for SW Gubbins Trust Estate No. 3 | Green Creek Regeneration Project | ERF173089 | Apr-22 | Active |
| CAC768316 | Anita Burcher; Kenneth Burcher | Four Corners Regeneration Project | ERF182610 | Mar-23 | Active |
| CAC769892 | Terra Carbon Pty Limited | Glenogie Native Forest Protection Project | EOP101055 | Apr-15 | Active |
| CAC770784 | AGRIPROVE SOLUTIONS PTY LTD | Flanders Carbon Project | ERF103197 | Apr-16 | Active |
| CAC771447 | Terra Carbon Pty Limited | Osterley Downs Native Forest Protection Project | EOP100653 | Apr-15 | Active |
| CAC776382 | Anne-Marie Schmitt; Jean-Luc Schmitt | Mulgaroon Forest Regeneration Project | EOP101101 | Apr-15 | Active |
| CAC777540 | Hamilton & Broadbent Investments Pty Ltd as trustee for Hamilton & Broadbent Land Trust | Wogarno Regeneration Project | ERF121739 | Jun-18 | Active |
| CAC777975 | Robert Banning | Kalkadoon and Old Cork Human-Induced Regeneration Project | ERF111320 | Apr-17 | Lapsed/Terminated |
| CAC778200 | Country Carbon Pty. Ltd. | Moroak & Goondooloo Stations | ERF103036 | Apr-16 | Active |
| CAC778764 | Remondis Australia Pty Ltd | Springmount Waste Management Facility Landfill Gas Flaring Project | ERF167993 | Apr-22 | Active |
| CAC781171 | TAMWORTH REGIONAL COUNCIL | Forest Road Landfill Gas Project | ERF103371 | Nov-16 | Completed |
| CAC781436 | EDL LFG (NSW) Pty Ltd | Lucas Heights 2 Landfill Gas Project | EOP100105 | Apr-15 | Completed |
| CAC783290 | DEVINE AGRIBUSINESS CARBON PTY LTD | DAC-2016-03 | ERF104547 | Nov-16 | Active |
| CAC783510 | LMS Energy Pty Ltd | Rochedale Landfill Gas Project Wollert Landfill Gas Project Wyndham Landfill Gas Project | EOP100183 EOP100098 EOP100168 | Apr-15 | Completed |
| CAC783640 | LMS Energy Pty Ltd | Albury Landfill Gas Project Awaba Landfill Gas Project Darwin Landfill Gas Project Ipswich Landfill Gas Project Newcastle Landfill Gas Project Remount Landfill Gas Project Wyong Landfill Gas Project | EOP100159 EOP100160 EOP100102 EOP100164 EOP100185 EOP100184 EOP100097 | Apr-15 | Completed |
| CAC783845 | John Kerin; Luke Kerin | SouthGlen Native Forest Regeneration Project | ERF105022 | Nov-16 | Active |
| CAC784319 | Tom Jackson | Austin Downs Station Regeneration Project | ERF121665 | Jun-18 | Active |
| CAC787280 | Gemma Cripps | Gabyon Station Regeneration Project | ERF120883 | Jun-18 | Completed |
| CAC787990 | Kurrajong Partners Pty Ltd | Mullagalah II Regeneration Project | ERF109630 | Sep-20 | Completed |
| CAC788080 | Gregory French; Tania French | Bimbijy Station Regeneration Project | ERF121681 | Dec-18 | Completed |
| CAC798321 | Rossmore Agriculture Pty Ltd as trustee for the Sendall Family Trust | Rossmore Landscape Project | ERF168123 | Apr-22 | Active |
| CAC799657 | Corporate Carbon Solutions Pty Ltd | Turpentine Carbon Project | ERF102074 | Nov-16 | Active |
| CAC800042 | NORTHMORE GORDON ENVIRONMENTAL PTY LTD | Smart Lighting Upgrade Project | ERF120525 | Jun-18 | Active |
| CAC800084 | AIC Projects (WA) Pty Ltd | Warroora Station | ERF164529 | Apr-21 | Active |
| CAC800232 | EDL Projects (Australia) Pty Ltd | Mandalong Waste Coal Mine Gas Power Station | ERF119472 | Dec-17 | Active |
About the project register
The project register and map shows the number, location and type of ACCU Scheme projects happening across Australia.
It includes:
- a description of the project
- location of the project
- number of ACCUs issued
- number of ACCUs relinquished
- any carbon maintenance obligations in place.
Please see the following tables for updates to the register as at 31 January 2026, since the register update from 31 December 2025.
Projects Registered since last update
| Project Proponent | Project Name | Method Type | Project location |
|---|---|---|---|
| Kunmallup Holdings Pty Ltd as Trustee for The Murray Family Trust | Kunmallup Tree Project | Vegetation | Western Australia |
| CARBON FIX PTY LIMITED | Big Jack Permanent Forest Project | Vegetation | New South Wales |
| PRINCE CARBON PTY LTD | Geandale Soil Carbon Project | Agriculture | New South Wales |
| Christopher Komor | Regen - Willow Bend | Vegetation | New South Wales |
| REDGUM FORESTRY PTY LTD | Redgum Origins Project | Vegetation | New South Wales |
| DUNWORRIE TRADING COMPANY PTY LTD | Dunworrie Soil Carbon Project | Agriculture | Queensland |
| LOAM CARBON PTY LTD | Woolingar Carbon Project | Agriculture | New South Wales |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 1 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 2 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 3 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 4 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 5 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 6 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 7 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 8 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 9 | Agriculture | South Australia |
| AGRIPROVE SOLUTIONS PTY LTD | Lochiel Carbon Project 10 | Agriculture | South Australia |
| Fairthorne Timber Trading Pty Ltd | Landari FFTT 2025 | Vegetation | Victoria |
| LANDARI PTY LTD | Landari Victoria Valley S3 2025 | Vegetation | Tasmania |
| LANDARI PTY LTD | Landari Jetsonville 2025 | Vegetation | Tasmania |
| Woodside Energy Carbon (Services) Pty Ltd | Woodside Plantation Forestry Project - Phase 1 | Vegetation | Western Australia |
| The Trust Company (Australia) Limited as trustee for ANZFOF Sub 1 | Border 2026 Carbon Project | Vegetation | South Australia, Victoria |
| LANDARI PTY LTD | Landari Osterley 2025 | Vegetation | Tasmania |
| LANDARI PTY LTD | Landari Bothwell 2025 | Vegetation | Tasmania |
Projects Revoked since last update
| Project Proponent | Project Name | Method Type | Project location |
|---|---|---|---|
| Merren Eleanor Turnbull; Timothy William Turnbull | Greenvale Regeneration Project (Revoked) | Vegetation | New South Wales |
| Doreen Shirley Pitman | Paradise Regeneration Project (Revoked) | Vegetation | Queensland |
| Kaizen Pastoral Company Pty Ltd as the Trustee for Kaizen Family Discretionary Trust | Kaizen Carbon 2 (Revoked) | Agriculture | Queensland |
ACCUs issued since last update
| Project Proponent | Project Name | Method Type | Project location | ACCUs issued since last update |
|---|---|---|---|---|
| EDL LFG (NSW) Pty Ltd | Lucas Heights 2 Landfill Gas Project | Waste | New South Wales | 216,928 |
| EDL LFG (NSW) Pty Ltd | Lucas Heights 2B Landfill Gas Project | Waste | New South Wales | 76,226 |
| Terra Carbon Pty Limited | Darling River Conservation Initiative Site #9 | Vegetation | New South Wales | 71,471 |
| Shoalhaven Starches Pty Ltd | Shoalhaven Starches Gas Turbine Co-Generation Project | Energy Efficiency | New South Wales | 64,665 |
| Cleanaway Solid Waste Pty Ltd | SITA Elizabeth Drive Landfill Gas Capture (flaring & electricity generation) - Kemps Creek project | Waste | New South Wales | 64,618 |
| Corporate Carbon Solutions Pty Ltd | Waratah Resource Recovery Project | Waste | New South Wales | 49,985 |
| LMS Energy Pty Ltd | Wyndham Landfill Gas Project | Waste | Victoria | 47,604 |
| National Carbon Bank of Australia Pty Ltd | National Carbon Bank of Australia Commercial and Public Lighting ERF Aggregator Project | Energy Efficiency | Australian Capital Territory, Northern Territory, Queensland, South Australia, Tasmania, Western Australia | 46,561 |
| Cheryl Hatch; James Patrick Hatch | Wombah Regeneration Project | Vegetation | Queensland | 43,108 |
| JBS Australia Pty Limited | JBS Beef City Wastewater Biogas Emissions Reduction | Waste | Queensland | 40,603 |
| Terra Carbon Pty Limited | Tallering Station Human Induced Regeneration Project | Vegetation | Western Australia | 37,484 |
| LGI Limited | Toowoomba Waste Management Centre - Landfill Gas Project - 2019 | Waste | Queensland | 34,889 |
| LMS Energy Pty Ltd | Eastern Creek 2 Landfill Gas Project | Waste | New South Wales | 27,604 |
| Darren Owen Cousens as trustee for the Platinum Pastoral Trust | Hillview Station Regeneration Project | Vegetation | Western Australia | 27,097 |
| JBS Australia Pty Limited | JBS Scone Wastewater Biogas Emission Reduction | Waste | New South Wales | 26,211 |
| Devine Agribusiness Carbon Pty Ltd | DAC-2015-02 | Vegetation | Queensland | 25,463 |
| Jorgen Lawn Jensen | Yoweragabbie Station Regeneration Project | Vegetation | Western Australia | 25,317 |
| Hugh Arthur Cameron; Marcia Joyce Cameron | Wongalee Mervyndale and Rundalua Forest Regeneration Project | Vegetation | Queensland | 23,591 |
| Corporate Carbon Solutions Pty Ltd | Longdowns Regeneration Project | Vegetation | New South Wales | 18,670 |
| Sunpork Consolidated Pty Ltd | Brinkley Biogas Flaring Project | Agriculture | South Australia | 17,833 |
| Terra Carbon Pty Limited | Boonora Downs Human-Induced Regeneration Project | Vegetation | New South Wales | 17,023 |
| Douglas Ernest Taylor as trustee for The Doug Taylor Discretionary Trust; Sandra Elaine Taylor and Kristofer Timothy Pascoe as trustees for the Pascoe Taylor Family Trust | Pullagaroo Station Regeneration Project | Vegetation | Western Australia | 17,004 |
| Gabrielle Anne Tomlinson; William Russell Tomlinson | Joonderee and Elmina Regeneration Project | Vegetation | Queensland | 16,664 |
| Carolyn Blomfield Pty Limited as the Trustee for the Blomfield Family Trust | Cheyenne Soil Carbon Project | Agriculture | New South Wales | 16,373 |
| Terra Carbon Pty Limited | Darling River Eco Corridor #36 | Vegetation | New South Wales | 16,295 |
| DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER | Koonaburra Regeneration Project | Vegetation | New South Wales | 15,761 |
| Sunset Ranch Pty Ltd | Sunset Ranch Native Forest Protection Project | Vegetation | New South Wales | 14,290 |
| Adrian Lewis Schmidt; Sally Anne Maree Schmidt | Baroona Regeneration Project | Vegetation | Queensland | 13,414 |
| LMS Energy Pty Ltd | Caloundra Landfill Gas Project | Waste | Queensland | 12,674 |
| Devine Agribusiness Carbon Pty Ltd | DAC-2015-03 | Vegetation | Queensland | 12,513 |
| CARBON REGENERATION NO.1 PTY LTD | Native woodland regeneration project BRO21 | Vegetation | Queensland | 11,143 |
| Terra Carbon Pty Limited | Darling River Eco Corridor 3 | Vegetation | New South Wales | 10,413 |
| St. John Smith | Mulga South Project | Vegetation | Queensland | 10,282 |
| Terra Carbon Pty Limited | Maureenjoy Human-Induced Regeneration Project | Vegetation | New South Wales | 10,197 |
| LMS Energy Pty Ltd | Woy Woy Landfill Gas Upgrade Project | Waste | New South Wales | 8,903 |
| Terra Carbon Pty Limited | Lynwood Native Forest Protection Project | Vegetation | New South Wales | 8,781 |
| Wandalong Carbon Pty Ltd atf Wandalong Carbon Trust | Wandalong Biodiverse Reforestation Project | Vegetation | Western Australia | 8,777 |
| Wespine Industries Pty Ltd | Continuous Drying Kiln Upgrade - Dardanup Mill | Energy Efficiency | Western Australia | 7,588 |
| Devine Agribusiness Carbon Pty Ltd | DAC-2015-01 | Vegetation | Queensland | 7,267 |
| LGI Limited | Hawkesbury Landfill Gas Upgrade Project | Waste | New South Wales | 7,134 |
| Terra Carbon Pty Limited | Southern Queensland Landscapes Conservation Initiative Site 1 | Vegetation | Queensland | 6,828 |
| Terra Carbon Pty Limited | Lower Lila Native Forest Protection Project | Vegetation | New South Wales | 6,292 |
| LMS Energy Pty Ltd | Woy Woy Landfill Gas Abatement Facility | Waste | New South Wales | 6,231 |
| GROUP ENERGY PTY LTD | Landari PPPA 3 | Vegetation | New South Wales | 6,207 |
| Terra Carbon Pty Limited | Darling River Eco Corridor #35 | Vegetation | New South Wales | 5,522 |
| INPEX Operations Australia Pty Ltd | Ichthys Biosequestration Assessment Project | Vegetation | Western Australia | 5,425 |
| Green Triangle Plantation Forest Company of Australia Pty Ltd | Sleatbank Carbon and Biodiversity Project | Vegetation | Victoria | 4,810 |
| Hazelmere Property Pty Ltd as trustee for the Hazelmere Family Trust | Nimagee Station Regeneration Project | Vegetation | New South Wales | 4,323 |
| BOWRAL WASTE CENTRE PTY LTD | Bowral Waste Centre LFG Emission Avoidance Project | Waste | New South Wales | 4,303 |
| Terra Carbon Pty Limited | Darling River Eco Corridor #39 | Vegetation | New South Wales | 3,627 |
| LMS Energy Pty Ltd | Glenorchy Landfill Gas Upgrade Project | Waste | Tasmania | 2,950 |
| LMS Energy Pty Ltd | Blaxland Landfill Gas Project | Waste | New South Wales | 2,801 |
| Devine Agribusiness Carbon Pty Ltd | Canegrass Carbon Farming Project 1 | Vegetation | Queensland | 2,790 |
| DEVINE AGRIBUSINESS CARBON PTY LTD | DAC-2016-03 | Vegetation | Queensland | 2,736 |
| OUTBACK CARBON PTY LTD | Devon Carbon Project | Vegetation | Western Australia | 2,346 |
| Devine Agribusiness Carbon Pty Ltd | Wallal Carbon Farming Project 2 | Vegetation | Queensland | 2,168 |
| Mitsui & Co. Wood Resources Oceania Pty Ltd | GT Carbon Project 1 | Vegetation | South Australia | 1,223 |
| LMS Energy Pty Ltd | Southern Waste Landfill Gas Upgrade Project | Waste | South Australia | 1,049 |
| Devine Agribusiness Carbon Pty Ltd | DAC-2015-16 | Vegetation | Queensland | 347 |
| The Trust Company (Australia) Limited as trustee for The Tasmanian Carbon Afforestation Sub-Trust | AA2024E_LoonganaP.S3 | Vegetation | Tasmania | 342 |
| Domenico Grieco | Oakvale Native Forest Protection Project | Vegetation | New South Wales | 313 |
| Terra Carbon Pty Limited | Kennabate Human Induced Regeneration Project | Vegetation | New South Wales | 283 |
| The Trust Company (Australia) Limited as trustee for The Tasmanian Carbon Afforestation Sub-Trust | AA2024R_FerrarL_S1S2S3 | Vegetation | Tasmania | 232 |
| INPEX NEW ENERGY BUSINESS AUSTRALIA PTY LTD | Yallalie Downs Carbon Project 2024 | Vegetation | Western Australia | 208 |
| The Trust Company (Australia) Limited as trustee for The Tasmanian Carbon Afforestation Sub-Trust | AA2024R_RhyndastonP_S3 | Vegetation | Tasmania | 140 |
ACCUs relinquished since last update
| Project Proponent | Project Name | Method Type | Project Location |
|---|---|---|---|
| There were no updates of this type. | |||
View the last tab in this spreadsheet for definitions of the terms used in the project register.
Following the recent amendment to the Carbon Credits (Carbon Farming Initiative) Rule 2015, we are now able to publish more information on the ACCU Scheme project register.
We have published extra data on the project register in stages between May and July 2025.
On 21 May we published the first stage of new data, which included:
- crediting period start and end dates of all projects
- permanence period start date of all sequestration projects.
On 19 June we published the second stage of new data, which included:
- project activities
- project suppressors, if applicable
- project agents.
On 17 July we published the final stage of new data, which included:
- modelling start dates
- approaches used to determine carbon abatement
- enforceable undertakings related to projects.
Find out more about how improving data transparency supports integrity in the carbon market.
You can apply to withhold the publication of certain data in very specific circumstances. This includes where:
- withholding the information is required to protect or respect ‘Aboriginal tradition’, as defined in the Aboriginal and Torres Strait Islander Heritage Protection Act 1984
- publication may threaten, damage or cause harm to a threatened ecological community or threatened species.
You can apply for an exemption by completing the application to withhold publication of certain project information on the ACCU Scheme project register form. Anyone with a relevant interest in an ACCU Scheme project can submit this form.
Our team will process your application within 30 days. If your application is successful, the relevant information will be removed from the project register during the following monthly update.
While we publish a lot of information on the project register, we are limited in what we can publish due to legislative secrecy provisions.
You can now choose to voluntarily provide more information about your project. We will publish any extra information you provide alongside the project register. This can include a link to a webpage containing further details about your project.
Providing this information will increase scheme transparency and show the market how your project has performed over time.
You can provide extra information for an existing project by completing the voluntary provision of supplementary information for publication on the ACCU Scheme project register form.
Participants are responsible for any extra information provided. We will not check or verify this information for accuracy or sufficiency against protected information previously provided.
We're required to keep the ACCU Scheme project register available and up to date. Following the recent amendments to the CFI Rule, we have started publishing monthly project register updates. These updates now occur shortly after the end of each month.
We take all reasonable steps to make sure items on the register are correct at the time of publication. If there are issues with any published data, contact us. We will investigate and make corrections as necessary. We will publish the corrections in the next project register update.
About the carbon abatement contract register
The contract register includes information about:
- carbon abatement contracts awarded by us
- contract duration
- end date and status
- volume of ACCUs contracted, released and delivered for each contract
- contract holder and ACCU Scheme project for each contract.
A total of 4,954,265 ACCUs have been delivered under carbon abatement contracts to the Commonwealth since 12 January 2023. Under specific circumstances, these ACCUs will be available for use in the Safeguard Mechanism’s cost-containment measure.
Multiple contracts
We list each contract separately. Some contractors have multiple contracts.
Optional delivery contracts
We have awarded optional delivery contracts since March 2020. These give sellers the option to sell carbon abatement to us. If the seller doesn't exercise their right to sell carbon abatement to us for a given delivery milestone, the volume of abatement committed under the optional delivery contract reduces from the original volume of abatement committed.
Expiry dates
Contracts expire when all obligations are finalised or where both parties have agreed to terminate. Note that the Clean Energy Regulator is unlikely to agree to a termination where the seller has not delivered the full contracted volume and is likely to still have access to ACCUs from their projects, including from projects that are not the anchor project for the contract.
Contracts will also lapse where conditions precedent haven't been fulfilled or waived by the expiry date set out in the contract. There may be a delay in reflecting a conditions precedent or activated contract ending in the contract register. This is due to ongoing contract negotiations between the seller and us.
Fixed delivery exit arrangements or lapsed optional delivery milestones
From 15 November 2023 the contract register includes information on contract volume that has been released through fixed delivery exit arrangements or through lapsed optional delivery milestones.
Human-induced regeneration (HIR) and native forest from managed regrowth (NFMR) projects
From 12 July 2020, the contract register includes extensions to the delivery periods of some contracts for HIR and NFMR projects. We granted extensions for certain projects after release and implementation of the Guidelines on stratification evidence and records for HIR and NFMR.