Project summary
| Project ID | Method Type | Method | Description | Project activities | Project suppressors, if applicable | Estimation or measurement approach or model | Enforceable undertakings related to this project | Supplementary project information |
|---|---|---|---|---|---|---|---|---|
| ERF168692 | Energy Efficiency | Carbon Credits (Carbon Farming Initiative-Industrial and Commercial Emissions Reduction) Methodology Determination 2021
Read the methodology determination |
This project reduces energy (fuel/electricity) emissions by (a) modifying, removing or replacing existing emissions-producing equipment; (b) installing equipment as part of replacing, modifying or augmenting existing emissions-producing equipment; (c) changing the way existing emissions-producing equipment is controlled or operated; (d) changing the energy sources or mix of energy sources used by existing emissions-producing equipment; (e) modifying, installing, removing or replacing equipment that affects the production of emissions by existing emissions-producing equipment; (f) installing equipment that generates electricity at a location for the primary purpose of: (i) providing electricity to existing emissions-producing equipment that, in the absence of the implementation activity, would obtain electricity from an electricity grid; of (ii) replacing existing off-grid electricity generation with lower emissions-intensity off-grid electricity generation. | Building management control system | n/a | n/a | n/a | n/a |
Participants
| Project Proponent | Agent |
|---|---|
| Sustainable Focus Pty Ltd | Robert Smith |
Timings
| Registration | Crediting period | Permanence period | Model start date(s) |
|---|---|---|---|
| 25/11/2021 | 1/09/2022 - 31/08/2029 | n/a | n/a |
Location
| Project location | Postcode | Project Area(s) | Mapping files |
|---|---|---|---|
| Queensland | 4509 | n/a | No mapping files provided |
Australian carbon credit units
| Total KACCUs issued | Total KACCUs relinquished | Total NKACCUs issued | Total NKACCUs relinquished |
|---|---|---|---|
| 1,407 | 0 | 0 | 0 |
Notes
21/12/2023 Variation of project method - from the Carbon Credits (Carbon Farming Initiative-Industrial Electricity and Fuel Efficiency) Methodology Determination 2015 (F2015C00783) to Carbon Credits (Carbon Farming Initiative-Industrial and Commercial Emissions Reduction) Methodology Determination 2021 (F2021L01789).