Project summary

Project ID Method Type Method Description
ERF122153 Energy Efficiency Carbon Credits (Carbon Farming Initiative-Industrial and Commercial Emissions Reduction) Methodology Determination 2021
Read the methodology determination
This project improves energy (electricity) efficiency by replacing equipment that affects the energy consumption of existing energy consuming equipment and installing equipment that generates electricity at a location where existing energy-consuming equipment consumes electricity obtained from an electricity grid and the electricity generated by the installed equipment will be used in substitution for the electricity obtained from an electricity grid.

Participants

Project Proponent
Crown Melbourne Limited

Timings

Registration Crediting period Permanence period
9/08/2018 9/08/2021 - 8/08/2028 n/a

Location

Project location Postcode Project Area(s) Mapping files
Victoria 3006 n/a No mapping files provided

Australian carbon credit units

Total KACCUs issued Total KACCUs relinquished Total NKACCUs issued Total NKACCUs relinquished
0 0 0 0

Notes

19/10/2022 Variation of project method - from the Carbon Credits (Carbon Farming Initiative-Industrial Electricity and Fuel Efficiency) Methodology Determination 2015 to the Carbon Credits (Carbon Farming Initiative-Industrial and Commercial Emissions Reduction) Methodology Determination 2021.

03/11/2023 This project has been revoked under section 30 of the CFI Rule.