Project summary

Project ID Method Type Method Description Project activities Project suppressors, if applicable Estimation or measurement approach or model Enforceable undertakings related to this project Supplementary project information
ERF119490 Energy Efficiency Carbon Credits (Carbon Farming Initiative-Commercial and Public Lighting) Methodology Determination 2015 (Compilation No. 1)
Read the methodology determination
This project is a lighting upgrade project that is modifying the lighting system, replacing the lighting system and supplementing the lighting system of mutiple types of serviced area.
  • 240V LED lamp
  • CFL with integrated ballast
  • CFL with non-integrated ballast
  • Control gear
  • ELV LED lamp
  • ELV infrared coated halogen lamp
  • ELV tungsten halogen lamp
  • High pressure sodium lamp
  • Incandescent lamp (240V) in traffic signals
  • Induction luminaire
  • Integrated photovoltaic luminaire unit
  • LED luminaire
  • Lighting control devices
  • Mercury vapour lamp
  • Metal halide lamp
  • T12 linear fluorescent
  • T5 circular fluorescent lamp
  • T5 linear fluorescent
  • T8 linear fluorescent
  • T8 or T9 circular fluorescent
  • Tungsten halogen lamp (240V)
n/a n/a n/a n/a

Participants

Project Proponent Agent
Environmental Markets Australia Pty Ltd The Sigma Global Company Pty Limited

Timings

Registration Crediting period Permanence period Model start date(s)
24/11/2017 1/01/2019 - 31/12/2025 n/a n/a

Location

Project location Postcode Project Area(s) Mapping files
Nation Wide n/a n/a No mapping files provided

Australian carbon credit units

Total KACCUs issued Total KACCUs relinquished Total NKACCUs issued Total NKACCUs relinquished
0 0 0 0

Notes

11/08/2022 This project has been revoked under section 30 of the CFI Rule